Perancangan Sequence Penambangan Batubara pada PT XYZ Provinsi Sumatera Selatan

Authors

  • Fahrul Indrajaya
  • Ayu Lusi Natallia Jurusan/Prodi Teknik Pertambangan, Fakultas Teknik, Universitas Palangka Raya
  • Neny Sukmawatie Jurusan/Prodi Teknik Pertambangan, Fakultas Teknik, Universitas Palangka Raya

DOI:

https://doi.org/10.33536/jg.v7i03.1384

Keywords:

sequence, mining geometry, stripping ratio

Abstract

Mining sequences are mining stages that indicate a pit will be mined from the initial opening to the final shape. The purpose of this study was to make the 2019 pit annual design and 2019 disposal based on the production target and then design the coal mining sequence for 3 months. This study uses a short term plan that is under 1 year using Minescape v 5.7. This research is in the Air Benakat Formation with 5 coal seams. In this study, we need some secondary data, namely; regional geological map, topography map, boundary LOM, actual design 2018, cropline data, production targets, and Stipping Ratio. PT. XYZ actually has a thickness of 35 m, top soil 1 - 1.5 m and 4000-4500 kcal calories with lignite coal class. The design pit 2019 on the S4 and S3 seam with a relatively uniform distribution and has a slope of 10°-15°. Coal reserves of 1,085,785 tons and overburden of 3,480,355 BCM with a swell factor of 1,8 which was at SR 3.2. The digging process uses the free digging method. Mining geometry parameters, namely; 35° high wall, 16° overall slope, 15° low wall, width is 10 m, and high is 6 m. The monthly production target in 2019 is 90,500 tons of coal with an overburden of 290,000 BCM. The third month design pit has 91,899 tons, covering an area of 11 Ha. Disposal 2019 have covering an area of 20 Ha, 8 levels, high is 5 m, 45° slope, located at 50m-85m elevation. Disposal of the first month with a capacity of 291,128 LCM. Disposal of second month with a capacity of 287,000 LCM. Disposal of third month with a capacity of 296,292 LCM. The first month pit design has stripping ratio 3.1, the second month pit design has stripping ratio 3.2, the third month pit design has stripping ratio 3.2.

Downloads

Download data is not yet available.

References

Nasution, M.A., 2015. Rencana Rancangan Tahapan Penambangan Batubara Untuk Menentukan Jadwal Produksi PT Cipta Kridatama, Kecamatan Meureubo, Kabupaten Aceh Barat, Provinsi Aceh (Doctoral dissertation, Fakultas Teknik (UNISBA)).

Aryanda, D., Ramli, M. and Djamaluddin, H., 2016. Perancangan Sequence Penambangan Batubara Untuk Memenuhi Target Produksi Bulanan. Jurnal Penelitian Geosains, 10(2).

Pratama, R.A., Saismana, U., Riswan, R. and Irawan, H., 2019. Perencanaan Sequence Bulanan Tambang Batubara di PT Batubara Kalimantan. Jurnal Himasapta, 3(01).

Saragih, Rizky.2018. Perancangan Tambang dan Mine Scheduling Untuk Blok Penambangan Baru Selama 3 Tahun di Pit Wara Pada PT.Adaro Indonesia Kabupaten Tabalong Provinsi Kalimantan Selatan. Jurusan Teknik Pertambangan Universitas Palangkaraya. Palangkaraya.

Wandy, M., Saismana, U., Riswan, R., Hakim, R.N. and Gusfrimanuel, G., 2016. Perhitungan Cadangan Batubara dan Perancangan Pit PT Anugrah Karya Raya, Desa Penain, Kec. Teweh Tengah Kabupaten Barito Utara, Kalimantan Tengah. Jurnal GEOSAPTA, 1(01).

Hidayat, T., Hidayat, T., Djamaluddin, D., Nawir, A. and Nawir, A., 2018. Desain Pit Compartment pada Hill Konde South Menggunakan Manual Pit dan Automation Pit Desain di PT. Vale Indonesia Tbk. Jurnal Geomine, 6(3), pp.150-156.

Gusmaningsih, K., Murad, M. and Yulhendra, D., 2018. Desain Pit Tambang Air Laya Barat Untuk Memenuhi Target Produksi Tahun 2018 PT. Bukit Asam (Persero) Tbk Sumatera Selatan. Bina Tambang, 3(3), pp.963-973.

Fadli, F., 2015. Desain Pit Penambangan Batubara Blok C pada PT. Intibuana Indah Selaras Kabupaten Nunukan Provinsi Kalimantan Utara. Jurnal Geomine, 1(1).

Prinandi, A.R., 2015. Perancangan (Design) Pit EF Pada Penambangan Batubara Di PT Milagro Indonesia Mining Desa Sungai Merdeka, Kecamatan Samboja Kabupaten Kutai Kartanegara Provinsi Kalimantan Timur.

Wijaya, K.G., Idrus, A., Sasongko, W. and Sasongko, W., 2012. Analisis Break Even Stripping Ratio dan Desain PIT Tambang Batubara PT. X.

Prakoso, R.A.A., Yuliadi, Y. and Zaenal, Z., 2019. Perancangan (Design) Pit dan Pentahapan (Sequence) pada Penambangan Batu Andesit di PT Tarabatuh Manunggal, Desa Cipinang, Kecamatan Rumpin Kabupaten Bogor, Provinsi Jawa Barat.

Mafruhi, M.A., Toha, M.T. and Bochori, B., 2018. Perencanaan Sequence Pengupasan dan Penimbunan Overburden di PIT 3 PT Baturona Adimulya (Doctoral dissertation, Sriwijaya University).

Haryono, A.F. and Aprilianta, I.P.E.D., 2017. Perencanaan Sequence Penambangan Batubara pada Seam 16 Phase 2 di PT. KTC Coal Mining & Energy, Kec. Palaran, Samarinda, Kalimantan Timur. ReTII.

Chen, J., Li, J., Luo, Z. and Guo, D., 2001. Development and application of optimum open-pit limits software for the combined mining of surface and underground. In Proceedings of CAMI Symposium (pp. 303-306).

Chatterjee, S., Sethi, M.R. and Asad, M.W.A., 2016. Production phase and ultimate pit limit design under commodity price uncertainty. European Journal of Operational Research, 248(2), pp.658-667.

Downloads

Published

31-12-2019

How to Cite

Perancangan Sequence Penambangan Batubara pada PT XYZ Provinsi Sumatera Selatan. (2019). Jurnal Geomine, 7(03), 230-240. https://doi.org/10.33536/jg.v7i03.1384

Similar Articles

21-30 of 85

You may also start an advanced similarity search for this article.