ESTIMASI CADANGAN TERUKUR ENDAPAN NIKEL LATERIT COG 2,0% MENGGUNAKAN METODE INVERSE DISTANCE PADA PT. TEKNIK ALUM SERVICE, BLOK X
DOI:
https://doi.org/10.33536/jg.v4i03.1380Keywords:
Reserve, inverse distance method, cut off grade (COG), PT. Teknik Alum Service, BulelengAbstract
PT. Teknik Alum Service is a mining company of nickel laterite. The location is in village of Buleleng, South Bungku district, Morowali regency, Central Sulawesi province. The aim is to determine the amount of total measured using the inverse distance method with Ni COG 2.0%. Work steps is to conduct a description of the drilling samples are then analyzed in a laboratory and then calculate the reserves with the inverse distance method. Total measured reserves using the Inverse Distance method is 83,775 tonnes
Downloads
References
Fitiran E.B., Massinai M.A., Maria, 2011, Identifikasi Sebaran Nikel Laterit dan Volume Bijih Nikel Daerah Anoa menggunakan Korelasi data Bor, Jurnal Geofisika Universitas Hasanuddin.
Gencom Company, 2007, Tutorial Surpac, Gencom, Australia.
Ningsih S.A., 2012, Eksplorasi Awal Nikel Laterit Di Desa Lamontoli Dan Lalemo, Kecamatan Bungku Selatan, Kabupaten Morowali, Provinsi Sulawesi Tenggara, Jurnal Ilmiah MTG, Vol. 5 No. 2. Yogyakarta.
Mustajam, 2012, Optimilisasi pemanfaatan Bijih Nikela kadar rendah dengan metode blending di PT. ANTAM Tbk. UPBN Sultra, Jurnal Teknologi Technoscientia Vol..4 No.2, Yogyakarta.
Hamilton Buchanan, 1807, Nickel Laterite Spesification, Limiting Constrants on The marked industrial minerals.
Santos-Ynigo dan Esguerra, 1961, Limestone Spesification, Limiting Constrants on The marked industrial mineral.
Downloads
Published
Issue
Section
License
Copyright (c) 2024 Jurnal Geomine

This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.







3.png)
1.png)
.png)
.png)
.png)
.png)
