KAJIAN TEKNIS PENIRISAN TAMBANG NIKEL LATERIT MENGUNAKAN METODE MINE DEWATERING
DOI:
https://doi.org/10.33536/jg.v4i03.1374Keywords:
Rainfall, catchment area, Pumps, Sump, Settling PondAbstract
Water will be a source of problems in the mining area, if not handled properly, this research is to study a technical draining the mine at one of the pit, the method used is Mine dewatering system aims remove the water that went into the pit and precipate particle before flowed into the river. the field observations seen a wide catchment area and is located in Beijing with an area of about Pit 37,6Ha. Average rainfall maximum at the study site is 23.82 mm / day. Rainfall plan is taken over a two-year period amounted to 22.74 mm / day and the intensity of the largest rain 7.88 mm / hour. The amount of monthly maximum rainfall is 1286.00 mm per year in order to know the amount of water runoff that will go to the sump 483.56 m3 / month or 17.26 m3 / day with the provisions of 1 month equals 28 days. The ability of the pump based on the total pumping head 48.67 m, and the ability to pump corrections 0.15 m3 / sec. It takes four pumps with the same type of effective working time 8.5 hours / day. The flow of water will go into the ditch of 0.47 m3 / sec and trenches to be made must be able to drain the water, then made trapezoidal ditch. Based on the results of research concluded that it take 4 unit pump that work for 8,5 hours a day and Making the settling ponds into three zones for the neutralization of the water before it flowed into the river.
Downloads
References
Amin, M. 2002. Penambangan Cadangan Batubara dengan Tambang terbuka: Kajian
Pertimbangan Hidrologi dan Lingkungan. Bandung. Institut Teknologi Bandung.
Baradja, U. A. 2015. Simulasi Penyaliran Tambang Melalui Optimasi Muka Air Kolam Untuk Menjaga Front Penambangan. Bandung. Program Studi Pertambangan Fakultas Teknik, Universitas Islam Bandung
Islam, B., dan Nendaryono. 2010. Penelitian Hidrogeologi Tambang Untuk Rencana Drainase Tambang Bawah Tanah. Bandung. Puslitbang Teknologi Mineral Dan Batubara.
Nurhakim. 2004. Tambang Terbuka. Program Studi Teknik Pertambangan. Banjarbaru. Universitas Lambung Mangkurat.
Putra, O. L., Iskandar, H., dan Rahman, A. 2013. Kajian Teknis Sistem Penirisan Tambang Banko Barat Guna Menanggulangi Dan Mengoptimalisasi Sistem Pemompaan Air Tambang di Pit Penambangan Iii Barat Pt Bukit Asam (Persero) Tbk.Tanjung Enim. Jurusan Teknik Pertambangan. Palembang. Universitas Sriwijaya.
Putra, A. Y. U., Ariyanto. 2013. Kajian Teknis Optimalisasi Pompa Pada Sistem Penyaliran Tambang Bawah Tanah di PT. Cibaliung Sumber Daya. Provinsi Banten. Yogyakarta. Megister Teknik Pertambangan UPN ”Vetran”. Sosrodarsono. 1993. Hidrologi untuk Pengairan. Jakarta. Pradnya Paramita.
Soewarno. 1995. Hidrologi, Aplikasi Metode Statistik Untuk Analisa Data. Bandung.
Nova Bandung.
Suwandhi, A. 2004. Perencanaan Sistem Penyaliran Tambang. Bandung.
Universitas Islam Bandung. Yusran, K., Djamaluddin, dan Budiman, A. A.
Sistem Penyaliran Tambang PIT PENAMBANGAN AB EKS Pada PT Andalan
Mining Jobsite Kaltim Prima Coal. Makassar. Jurusan Teknik Pertambangan UMI.
Downloads
Published
Issue
Section
License
Copyright (c) 2024 Jurnal Geomine

This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.







3.png)
1.png)
.png)
.png)
.png)
.png)