SINKRONISASI ALAT ANGKUT DENGAN ALAT MUAT TERHADAP TARGET PRODUKSI ASPAL PADA PT. WIJAYA KARYA KABUPATEN BUTON PROVINSI SULAWESI TENGGARA. (2016). Jurnal Geomine, 4(01), 23-27. https://doi.org/10.33536/jg.v4i01.1556